Methodology
About YardPermits
YardPermits is a small static directory of backyard-project permit rules. Chris Wahl publishes it through 4Wahls LLC. The canonical site is https://yardpermits.com.
The first pages cover the Phoenix metro: Gilbert, Chandler, Mesa, Tempe, Scottsdale, Phoenix, and Queen Creek. Gilbert is the flagship. Each city is one JSON file rendered by the same city template.
What a city page will say
For patio covers and pergolas, block walls and fences, storage sheds, and where the city publishes them, casitas and flatwork:
- Whether a permit is required, and the size, height, attachment, or utility line that changes the answer.
- Setbacks, when the city actually printed them.
- The permit fee, or a link to the fee schedule when the fee is calculated from valuation.
- The review time, when the city published a goal. Monthly averages are labeled with the report month.
- The building department phone and URL.
- A separate HOA section. Association approval is not the city permit.
What we will not invent
A fee, a square-foot threshold, a height limit, or a review time is published only when the sentence
has an official source URL and a checked date. npm run build fails if either is missing.
If a city page does not state the number, YardPermits says it is not published and links the page we read.
A “typical cost to build” appears only when a real source states a range. Most project sections omit it.
The checked date is the day that source was read for this site, not the day the city adopted the rule. Where a city document prints its own revision date, the page repeats that date in the sentence.
HOA versus the city
Arizona law on planned communities says association approval of plans is not a warranty that the work meets government requirements. Several of these cities also tell homeowners to get association approval before they apply, and that the city does not enforce CC&Rs. Your association can be stricter than the city. Start there if you have one, then get the city permit the project needs.
How a new city is added
- Copy
src/data/cities/gilbert-az.jsontosrc/data/cities/{slug}-az.json. The slug is the URL, so Queen Creek isqueen-creek-az.jsonand the page is/az/queen-creek/. - Replace the city fields. Keep project ids
patio-cover,fence, andshed. Addaduorflatworkonly when you have a source. - Put every fee, threshold, setback, review time, and rule in a fact with
sourceUrl,sourceTitle, andcheckedasYYYY-MM-DD. Use the official city or state page. Do not put measurements or dollar amounts inledeorpermitLabel. - Run
npm run build. The validator runs first. A missing source or checked date stops the build. - The home page, the Arizona hub, the city URL, and
sitemap.xmlpick up the file. No template change.
Disclaimer
Rules change, and a lot line, a PAD overlay, a historic district, or a hillside lot can change the answer. YardPermits is not the city, not your HOA, and not a permit technician. Confirm the current rule with the building department on the city page before you build.